久久老子无码午夜伦不卡,亚洲Av不卡在线,人人澡人人添人人爽,成人无码AV在线播放国产,亚洲美女被草在线观看,日本AAA大片久久久,国产亚洲中文日本不卡2区,东京热久久综合,国产毛片精品久久完整版性久久,日本老熟妇乱子伦精品,国产粉嫩嫩06在线正在播放。,99久久亚洲精品无码,久久综合九九一区亚洲,国产精品久久久久久电影,亚洲AV无码精品色午夜在线观看

泰安揚(yáng)帆數(shù)控科技有限公司為您提供等相關(guān)信息發(fā)布和資訊展示,敬請(qǐng)關(guān)注!
咨詢服務(wù)熱線:
13345281377

新聞資訊

產(chǎn)品

焊接專機(jī)維修可使用對(duì)比、置換元器件、逐步開(kāi)路法

來(lái)源:http://www.ykwanda.com/  發(fā)布時(shí)間:2023-02-21 瀏覽次數(shù):0

(1)對(duì)比法
(1) Comparative method
把檢測(cè)數(shù)據(jù)與圖樣資料及平時(shí)記錄的正常參數(shù)相比較來(lái)判斷故障。對(duì)于無(wú)資料又無(wú)平時(shí)記錄的電器元器件,可查閱相關(guān)手冊(cè)或者產(chǎn)品說(shuō)明書,也可以與同型號(hào)的完好電器元器件相比較。
Compare the test data with the drawing data and normal parameters recorded at ordinary times to determine the fault. For electrical components without data and normal records, you can refer to relevant manuals or product instructions, and also compare them with the intact electrical components of the same model.
電路中的電器元器件元件屬于同樣用途性質(zhì)或多個(gè)元件共同控制同一設(shè)備時(shí),可以利用其他相似的或同一電源的元件動(dòng)作和數(shù)據(jù)情況來(lái)判斷故障。
When the electrical components in the circuit belong to the same purpose or multiple components jointly control the same equipment, the actions and data of other similar or the same power supply components can be used to determine the fault.
(2)置轉(zhuǎn)換元件法
(2) Transposition element method
為了保證山東焊接專機(jī)的利用率,某些電路的故障原因不易確定或檢查時(shí)間過(guò)長(zhǎng)時(shí),利用相同焊接設(shè)備上可轉(zhuǎn)換的同一性能良好的元器件實(shí)驗(yàn),以證實(shí)故障是否由此電器在元器件引起。
In order to ensure the utilization rate of Shandong special welding machine, when the fault cause of some circuits is not easy to determine or the inspection time is too long, use the same component with good performance that can be converted on the same welding equipment to test to verify whether the fault is caused by the electrical appliance in the component.
山東焊接專機(jī)
運(yùn)用轉(zhuǎn)換元件法檢查時(shí)應(yīng)注意,當(dāng)把原電器元器件拆下后,要認(rèn)真檢查是否已經(jīng)損壞,只有肯定是由于該電器元器件本身因素造成損壞時(shí),才能換上新電器元器件,這樣可以防止新?lián)Q元件再次損壞。
When using the conversion element method for inspection, it should be noted that when the original electrical components are removed, carefully check whether they have been damaged. Only when it is certain that the electrical components are damaged due to their own factors, can they be replaced with new electrical components, which can prevent the new components from being damaged again.
(3)逐步開(kāi)路(或接入)法
(3) Stepwise open-circuit (or cut-in) method
焊接設(shè)備中多支路并聯(lián)且控制較復(fù)雜的電路短路或接地時(shí),一般有明顯的外部表現(xiàn),如冒煙、有燒焦痕跡等。電焊機(jī)內(nèi)部或帶有護(hù)罩的電路短路、接地時(shí),除熔斷器熔斷外,不易發(fā)現(xiàn)其他外部現(xiàn)象,這種情況可采用逐步開(kāi)路(或接入)法檢查。
When multiple branches are connected in parallel and the circuit with complex control is short circuited or grounded in the welding equipment, there are usually obvious external manifestations, such as smoke, burning traces, etc. When the circuit inside the welding machine or with a shield is short-circuited or grounded, it is not easy to find other external phenomena except the fuse is blown, which can be checked by the gradual open-circuit (or access) method.
①逐步開(kāi)路法:遇到難以檢查的短路或接地故障,可重新更換熔斷器熔體,把多支路電路,一路路逐步或地從電路中斷開(kāi),然后通電試驗(yàn),若熔斷器一再熔斷,故障就在剛剛斷開(kāi)的這條電路上。然后再將這條支路分成幾段,逐段地接入電路。當(dāng)接入某段電路時(shí)熔斷器又熔斷,故障就在這段電路及某電器元器件元件上。這種方法簡(jiǎn)單,但容易把損壞不嚴(yán)重的電器元器件元件徹底燒毀。
① Step by step open circuit method: In case of a short circuit or ground fault that is difficult to check, the fuse melt can be replaced, and the multi-branch circuit and one circuit can be gradually or emphatically disconnected from the circuit, and then the power-on test. If the fuse is blown repeatedly, the fault is on the circuit that has just been disconnected. Then the branch is divided into several sections and connected to the circuit section by section. When a circuit is connected, the fuse is blown again, and the fault is on this circuit and some electrical components. This method is simple, but it is easy to completely burn the electrical components that are not seriously damaged.
②逐步接入法:電路出現(xiàn)短路或接地故障時(shí),換上新熔斷器逐步或地將各支路一步一步地接入電源,重新試驗(yàn)。當(dāng)接到某段時(shí)熔斷器又熔斷,故障就在剛剛接入的這條電路及其所包該文章講述了焊接設(shè)備故障的檢查方法與維修經(jīng)驗(yàn).含的電器元器件上。
② Step by step access method: when the circuit has a short circuit or ground fault, replace with a new fuse, gradually or emphatically connect each branch to the power supply step by step, and retest. When a certain section is connected, the fuse is blown again, and the fault lies in the circuit just connected and the electrical components included in the article. This article describes the inspection method and maintenance experience of welding equipment fault.
以上就是焊接專機(jī)維修可使用對(duì)比、置換元器件、逐步開(kāi)路法的相關(guān)內(nèi)容了,您對(duì)此有怎樣的疑惑或者需求就來(lái)我們網(wǎng)站http://www.ykwanda.com咨詢!
The above is the relevant content of the comparison, replacement of components and gradual opening method that can be used for the maintenance of special welding machines. If you have any doubts or needs about this, please come to our website http://www.ykwanda.com consulting service

上一篇:焊接專機(jī)的三大應(yīng)用優(yōu)勢(shì)
下一篇:自動(dòng)焊接設(shè)備與焊接變位機(jī)的協(xié)調(diào)運(yùn)動(dòng)

日本成人一级不卡视频 | 国产一区二区精品人妖系列| 少妇熟女一区二区图片| 国产精品 第 页| 最新亚洲av无码专区首页| 久久天天躁狠狠躁夜| 黄片Av一区二区三区| 久久久久无码精品国产古代| 伊人久久大香线蕉综合高清| 亚洲av福利无码无一区二区| 蜜桃精品99有码| 久色视频在线| 日韩在线直播天堂Av| 人人妻人人澡人人爽欧美精品| 特级黄国产片一级视频播放| 久久亚洲欧洲精品无码AV| 国产精品美女久久久另类人妖 | 亚洲国产精品嫩草影视大全| 亚洲国产中文精品视频2019| 伊人无码AV一区二区三区| 日本大乳高潮视频在线网站| 在线亚洲欧美日本专区| 亚洲AV无码成人精品区不卡网站| 欧美视频在线视频精品| ww555kkk欧美精品| 动漫自慰精品一区二区| sm亚洲另类首页| 国产6699视频在线观看| 免费国产激情| 精品国产aⅴ无码一区二区91 | 亚洲日本欧美在线不卡黑配白| 91精品免费观看网站| 视频 国产 精品 熟女| 天堂无码电影在线| 日本阿v网站在线观看中文| 国产精品免费视频一区二区三区| 国产蜜臀AV在线一区二区三区| 亚洲91视频| 五月综合色婷婷影院在线观看| 色综合久久一| 少妇性饥渴无码免费不卡专区|